BNSF 5863 rolls its coal empties west on double track east of Orin, passing a loaded eastbound train barely visible in the distance, that is stopped at the end of double track, waiting for this tr... (more)
BN 5523 has 3 KCS units in the consist as it crosses Hwy 20 in Orin WY. with and empty coal train in May of 1990.
BNSF 5618 heads a loaded coal train southeast toward Wendover Canyon after leaving Orin, WY and the Powder River Basin connection.
This North Western train was told by the dispatcher to "hold for seven" at Shawnee Junction - a busy place.
His caboose just out of the siding at Bridger, this Smithers Lake empty is about to throttle up and start around the curve toward Orin Jct. and head up for another loadout.
These good looking clouds were the beginning to a sunless, rainy day in the Powder River Basin.
BN 2815 leading a weed sprayer train at Orin WY.
BNSF's H-LINLAU1-03A train crosses under Interstate 25 in Orin, Wyoming on its way to Laurel, Montana, via Casper.
A loaded coal train from the Powder River Basin crosses Hwy 20 near Orin, Wyoming with BNSF 9871 on the point.
With the Laramie mountains in the background, BNSF 5651 on the point of coal empties just east of Orin, WY.
BNSF 5651 with empties and BNSF 9691 with loads meet just east of Orin, WY.
BNSF 9820 and BNSF 9660 working as a DP units bring up the rear on a set of coal empties at Orin, WY.
Pace shot of DPU on an empty train returning to the PRB.